1ROUGH OPENING PREPARATION INsTAllATION

Transcripción

1ROUGH OPENING PREPARATION INsTAllATION

                                    

Documentos relacionados

1ROUGH OPENING PREPARATION INsTAllATION

1ROUGH OPENING PREPARATION INsTAllATION the surface the door will be set on, add a filler board under the sill. The top of the filler board should be within 1" of the finished floor height. C. Verify the door will fit the opening. Measur...

Más detalles