Residentes Asisten Ceremonia de la Remoción del
Transcripción
Residentes Asisten Ceremonia de la Remoción del
Holly Plant Decommissioning Neighborhood Newsletter Boletín del Desmantelamiento de la Planta Eléctrica Holly TRC and AE Project Update Residents Attend First Bolt Removal Ceremony On October 22, Holly residents attended a ceremony inside the power plant site to mark the removal of the first bolt and initiate the demolition process by the contractor, TRC. Approximately 75 residents attended the event that was hosted by Mayor Leffingwell and Austin Energy (AE). AE General Manager, Larry Weis, introduced the Holly Decommissioning Committee members and thanked them for their hard work. Council member Mike Martinez thanked the residents for coming to commemorate this long anticipated event. Members of the committee and other residents that have participated in the effort to shut down the power plant then proceeded to turn the two wrenches that removed the first bolts from the power plant. TRC continues to work with AE and Weston, the engineering firm: • TRC continues to submit all required documents for review and approval by AE and Weston. When all submittals have been reviewed and approved, TRC will begin the actual removal work. • TRC has installed monitoring equipment and tests equipment at the plant that will monitor all vibrations caused by their work. • 13 job application forms have been requested to date. Job applications can be obtained at any of four locations in the neighborhood: Metz Recreation Center, Camacho Activity Center, Cristo Rey Parish Hall, and Metz Elementary school. • A website dedicated to the Holly plant decommissioning has been established. The website address is: http://www.holly. austinenergy.com. Residentes Asisten Ceremonia de la Remoción del Primer Tornillo El 22 de octubre, residentes de Holly asistieron la ceremonia dentro la planta eléctrica para marcar la remoción del primer tornillo e iniciar el proceso de demolición por parte del contratista, TRC. Aproximadamente 75 residentes asistieron el evento albergado por el alcalde Lee Leffingwell y Austin Energy (AE). El gerente general de Austin Energy (AE), Larry Weis, presentó a los miembros del Comité de Desmantelamiento de Holly y los agradeció por su trabajo dedicado. El concejal, Mike Martinez, agradeció a los residentes por venir a conmemorar este evento demasiado anticipado. Miembros del comité y otros residentes que han participado en el esfuerzo para cerrar la planta eléctrica procedieron a dar vuelta a las dos llaves que quitaron los primeros tornillos de la planta. continued on back #36 – November 2011 #36 – noviembre 2011 Actualización del Proyecto TRC y AE TRC continúa a trabajar con Austin Energy y Weston, la compañía de ingeniería contratada: • TRC continúa a someter todas las sumisiones requeridas para reviso y aprobación por parte de AE y Weston. Cuando todas las sumisiones se han revisado y aprobado, TRC empezará el trabajo actual de remoción. • TRC continúa a someter todas las sumisiones requeridas para reviso y aprobación por parte de AE y Weston. Cuando todas las sumisiones se han revisado y aprobado, TRC empezará el trabajo actual de remoción. • TRC ha instalado equipo de monitoreo y prueba equipo en la planta que monitorizará todas las vibraciones causadas por su trabajo. • 13 aplicaciones de empleo se han pedido actualmente. Aplicaciones de empleo se pueden obtener en cualquiera de cuatro locales en la vecindad. Centro de Recreación Metz, Centro de Actividades Camacho, Parroquia de Cristo Rey, y la escuela primaria de Metz. Continuación atrás Public Meeting/Audiencia PúblicaDate/Fecha: November/noviembre 15, 2011 Time/Hora: 6:30 p.m. Place/Sitio: Metz Recreation Center, 2407 Canterbury Street Whom to Call: Oscar Backus, Public Information Specialist, Senior, Austin Energy, 322-6276, [email protected] Ed Clark, Communications Director, Austin Energy, 322-6514, [email protected] Con Quién Comunicarse en Español: Oscar Backus, Public Information Specialist, Senior, Austin Energy, 322-6276, [email protected] Holly Committee / Comité Holly: Gavino Fernandez [email protected] Lela E. Castro 288-2258 Elisa Rendón Montoya [email protected] Donna Vasquez 789-3140 Louis J. Cerda Anita Quintanilla [email protected] Rebecca Turrubiart 417-5057 Joe Perez 939-7321 Marcos de León continued from front This website will feature updated information on all aspects of the project and will be maintained through the completion of the project. Continuado • Un sitio web dedicado al desmantelamiento de la planta Holly se ha establecido. El domicilio del sitio web es: http://www.holly.austinenergy.com. Committee Action Items El sitio web tendrá información actualizada sobre todos los aspectos del proyecto y será mantenida hasta la terminación del proyecto. The Holly Decommissioning Committee meeting was held on October 18. The following items were discussed: • A parking lot at the Metz Recreation center to accommodate visitors to the center during the demolition work will be built by TRC first, followed by construction of the road connecting the plant entrance to Pedernales street. • Neighborhood safety is of concern; therefore committee members and their neighborhood coordinators will distribute demolition project information flyers door-to-door throughout the neighborhood. Anyone wishing to be added to the newsletter distribution list or to receive the newsletter via email can call 322-6276 or send an email to [email protected]. Oscar Backus, P.E. Austin Energy 2401 Holly Street, Building X Austin, TX 78702 Puntos de Acción del Comité La junta del Comité de Desmantelamiento de Holly se celebró el 18 de Octubre. Lo siguiente se aclaró: • Un estacionamiento en el Centro de Recreaciones Metz para acomodar a los visitantes al centro durante el trabajo de demolición será construido por TRC primero, seguido por la construcción del camino que conectará la entrada de la planta con la calle Pedernales. • La seguridad de la vecindad es de interés; por lo tanto los miembros del comité y sus coordinadores distribuirán de puerta en puerta a través de la vecindad folletos de información sobre el proyecto. Si alguien quiere estar en la lista de distribución del boletín o recibirlo vía email, puede llamar al 322-6276 o enviar un email a [email protected].