PDF (full)
Transcripción
PDF (full)
Estabilización de taludes SNUFF MILLS, GB SNUFF MILLS Estabilización de taludes Proyecto Lugar País / Región Snuff Mills Frenchay, Bristol Gran Bretaña Año de instalación: 2001 Cliente Ingeniería: Contratista Bristol City Council - Neighbourhood and Housing Services Bristol City Council BAM Ritchies / BAM Nuttall Ltd. Situación A commercial building within an old quarry was at risk of falling rocks from the back wall of the quarry. Descripción A total number of 44 rock bolts and 4 anchors were installed at height into a sub-vertical to overhanging cliff. 420 m² of high tensile TECCO ® G65/3 steel mesh was installed to work with the rock bolts. These ranged in length between 3 and 12 [m] and the anchors were between 8 and 12 m. As the works were generally greater than 6 m in height above ground level, supplementary man access via ropes or mobile elevating work access platform was used. The low weight of ® TECCO G65/3 mesh rolls was ideal for this project. Objeto protegido Sistemas Edificio TECCO ® G65/3 Protección contra la corrosión GEOBRUGG SUPERCOATING ® titel_projekt_geologie Sandstone. Área estabilizada 420 m² Altura del talud Inclinación del talud 10 m 70 ° - 80 ° Medida de protección Estabilización activa del talud Exposición - Estabilización de taludes | Snuff Mills, GB 2/4 Fully installed TECCO® SYSTEM³ Rope access techniques were used to install the TECCO® SYSTEM³ View on the works as the TECCO® SYSTEM³ spike plates type P33/40 were being installed. Estabilización de taludes | Snuff Mills, GB 3/4 Si tiene preguntas por favor póngase en contacto con nuestro especialista Geobrugg en su área: Eberhard Gröner Project Manager North-West Germany, Regional Manager UK Teléfono +41 71 466 81 57 Móvil +41 79 421 17 01 [email protected] Geobrugg AG Aachstrasse 11 | 8590 Romanshorn | Suiza [email protected] | www.geobrugg.com A company of the BRUGG Group | Certified to ISO 9001 Estabilización de taludes | Snuff Mills, GB 4/4
Documentos relacionados
LENDAVA TOWN, SI
For remediation the TECCO ® SYSTEM³ was used. To globally stabilize the rock face, 9.0 [m] long GEWI nails were installed. The nail pattern was defined on presumption, that the top layer of rock wo...
Más detalles